One Stop System Architecture Design and Construction Case Study <Machine Parts Manufacturing Factory>
Manufacturing factory for machine parts with ceiling crane, improving work environment through economic span.
Utilizing the features of our system construction, we have installed a 2.8t ceiling crane while achieving a large span of 30m. By pursuing economical design for the column pitch in the longitudinal direction of the building, we have secured a spacious interior while also realizing low costs. The roof is made of double-folded panels, and glass wool is used for the exterior walls, particularly considering the working environment in high-temperature and high-humidity conditions during the summer. Additionally, skylights have been incorporated into the roof, actively bringing in natural light during the day to reduce electricity costs. Construction Location: Hashimoto City, Wakayama Prefecture Building Use: Machinery Parts Manufacturing Factory (Bearing Manufacturing) Building Size: Steel structure, 2 stories, 11,123.28 square meters (3,364 tsubo) Completion: November 2021 *You can view the case materials from the <PDF download>. For details of the system, please refer to the "One Stop System Construction Introduction Materials."
- Company:川田工業 建築事業部
- Price:Other